AL-HARAMAIN SUBSTATION SCADA SYSTEM
![]() | ![]() | ![]() |
|---|
AL-HARAMAIN SUBSTATION SCADA SYSTEM
AL-Haramain Substation is an EPC project implemented by ABER AL-ALA'AM. was being asked to install a fully automatic Supervisory Control and Data Acquisition System for the Al-Haramain 33/11 KV AIS Substations in Karbala City. This system receives constant incoming feedback including:
-
Digital input single point (DI-SP) of 290 signals.
-
Digital input double point (DI-DP) of 66 signals.
-
Analog input double point of 196 signals.
-
Digital output of 148 signals.
to ensure proper control and operation of the substation.